Click Here to Submit a Good Catch
⭐️
Click Here to Submit a Good Catch ⭐️
Good Catch Entry Leaderboard
Keep in mind: The leaderboard reflects the number of submissions received and is intended for participation tracking only. Entry counts do not indicate standings, submission quality, scoring, eligibility, or likelihood of winning. All submissions are evaluated according to the program's qualifying criteria and judging standards. Statistics are updated every Monday, or the next business day if a holiday occurs.
Individual
Location
Sort & Filter
View All
View by Category
View by Business
- AL 6
- AL-Attalla 3
- AL-Leeds 2
- AL-Rainbow City 1
- Aggregates 19
- Cement 4
- Fly Ash 14
- GA 7
- GA-Gainesville 2
- GA-Lithonia 1
- GA-Sparta 3
- GA-Toccoa 1
- GRR 29
- NC 8
- NC-Bunnlevel 2
- NC-Durham 1
- NC-Goldsboro 1
- NC-Moncure 2
- NC-Rocky Mount 1
- NC-Wake Forest 1
- RMC 2
- SC 47
- SC-Anderson 2
- SC-Gaston 1
- SC-Georgetown 2
- SC-Harleyville 28
- SC-Lexington 8
- SC-McConnells 2
- SC-Pineville 1
- SC-Sumter 1
- SC-Taylors 2
Aggregates
Submitted by:
Lec Overacker
Location:
Lithonia, GA
General Safety Concern
Improving access to environmental outfall locations is an important part of maintaining safe and effective water sampling practices. While many of these locations have traditionally been accessed by established trails, changing conditions such as vegetation growth, fallen tree limbs, erosion, and uneven terrain can create potential safety hazards that may not have existed when the paths were originally developed.
As part of Heidelberg Materials' ongoing efforts to improve safety and accessibility at environmental sampling locations, all Quality Control technicians were asked to evaluate their assigned outfalls and recommend improvements where needed.
One employee who took this initiative to heart was Rodney Johnson, who recently completed significant improvements to Outfall #1 at Big Ledge Quarry. Rodney enhanced the access route, creating a safer, more practical pathway for routine water sampling. His attention to detail and commitment to continuous improvement demonstrate the proactive safety culture we strive to maintain.
Although the improvements have already made a noticeable difference, Rodney continues to look for ways to further enhance the location and has suggested adding a catwalk with handrails to provide even safer access in the future.
Recognizing: Rodney Johnson
Aggregates
Submitted by:
Samuel Edwards
Location:
Taylors, SC
Excellence in Environmental Practice/Procedure
During the stripping campaign, we had to move our overburden down a public road using dump trucks. We installed FOD Mats at the exit for trucks to drive across before entering the roadway. This allowed dirt and mud to fall from the trucks on site instead of on the road.
Fly Ash
Submitted by:
Matt Vesce on behalf of Charles Sweat
Location: Pineville, SC
Unsafe Condition/Situation
Charles noticed an unusual amount of dust coming from the Cross dry fly ash loading process. Charles immediately initiated a STOP WORK by pressing the E-STOP. Loading was suspended until the chute was repaired.
GRR
Submitted by:
Damon Barton
Location:
Harleyville, SC
Unsafe Condition/Situation
During a Management by Walking Around (MBWA) inspection, we observed a hazardous waste drum with an unsecured lid and a locking ring that was not properly fastened, creating a potential risk of spills or release of hazardous material.
We notified the responsible operator and ensured the drum lid and locking ring were properly secured. Reinforce proper hazardous waste container management and closure requirements with employees.
GRR
Submitted by:
Megan Stroble
Location:
Harleyville, SC
Excellence in Environmental Practice/Procedure
Walking through the building, I noticed empty boxes and an empty acetone jug against the wall. This does not reflect our proper housekeeping practices. All waste was discarded to its correct location.